본문 바로가기 주메뉴 바로가기

프로젝트

PROJECT

프로젝트

CAPE HOLLAND, 188 PIN PILES FOR FORMOSA 2 OWF TAIWAN

관리자 2024-05-18 조회수 166

DATE: FEBRUARY 13, 2023

188 PIN PILES FOR FORMOSA 2 OWF TAIWAN

Starting in 2020, a CAPE VLT-320 has been used to upend and drive pin piles with a diameter of 96 inches through a pre-piling template at the Formosa 2 Offshore Wind project off the coast in Taiwan.

The CAPE VLT was selected to prevent pile run in the soft soil layers and to speed up the upending and handling process. The spread was configured using CAPE Holland equipment from the Seaway7 equipment fleet, supplemented with equipment from the CAPE Holland rental fleet, whereby Seaway7 is making maximum use of their modular investment. The CAPE VLT was powered by Seaway7’s own powerpack from the impact hammer which was already converted a few years earlier by CAPE Holland to also be able to drive the CAPE VLT’s.

Seaway7 was contracted by Jan De Nul Group for completing the pin pile scope at 47 WTG locations.